Project

Haus der Musik

The full capacity of the building shell of the building of the house of music would include at least three very concentrated levels and thereby be connected to the Tiroler Landestheater, as if it were subordinate to the Tiroler Landestheater. In our proposal, the north facade of the House of Music will spring back compared to the permissible limit building and get more space for the public program within the House of Music “air”. Consequently, the required number of floors of the House of Music will rise.

However, the additional features of a house of music with a more solitary character, as an independent and democratic institution is without bias in the surrounding context, combined with a transparent and clear interior, encounters and unexpected relationships are made possible, which we believe offer greater Weight. In addition, the channel height of the neighbouring buildings is observed from a recoil (backward tilt) of the south facade to around 13 meters.

The House of Music consists of two building volumes with an open public space in between, which connects the two volumes together. The building is oriented to the square on the Rennweg. There is also the main entrance, overlooking the Imperial Palace and the connection to the old town. The northern volume follows the orthogonal grid of the Tiroler Landestheater and accommodate all concert halls and theatres. The southern volume follows the angular displacement of University Street. In this part all the offices and rehearsal rooms are planned. Both volumes are raised to the side of the racing path and the University street above street level, so that the public space from the square and the road extends into the House of Music.

The transparent façade and public programming throughout baseboards Rennweg and Universitätsstrasse improve accessibility and create attraction and liveliness. In the northern volume all the halls are stacked. The internal logistics platform is therefore organized very efficiently. Within a radius of 15 meters around the scenery lift all platforms and storage rooms on the various floors are accessible without barriers.

The public road dynamic that extends into the building, leads the guests to the heart of the space, from where you will be invited to have a look at a representative cross-section of the entire house of the music program.

Year
2014
Status
Competition
Location
Innsbruck, Austria
Size
16.200 m2
Partners
Design team: Paul Geurts in collaboration with TOMDAVID Architecten